Permitting for the restart of mining operations is in place and required water and surface rights have been in place for years. All facilities envisioned in the current PEA are located in “brownfields” locations such that no new surface disturbances are anticipated. Modifications required for the revised mine plan and flowsheet as a result of the PEA are at an advanced stage and will be addressed in the coming months as project finance discussions are finalized.